Bind an action to an operation
The flow does not repeat the process: what is done to the item, an "Action" node takes from an operation. Bind it to "Lathe work".
On the canvas
The route Input → Action → Output. The operation "Lathe work" stands under it. The panels are closed, their buttons are above the canvas.
Steps
- Drag the "Action" icon down onto the operation "Lathe work". A frame lights up around the operation — release. The node takes its place right above the operation, one cell higher, and a dashed line runs from it to the operation.
- Drag the operation "Lathe work" aside. The dashed line follows it: the binding holds.
Check
A dashed line runs from the "Action" to "Lathe work". Rest the pointer on it: the hint says "Action → Lathe work".
If it did not work
- No dashed line — the node was released beside the operation. The frame around the operation must be lit at the moment you release the button.
- The frame does not light up — you are dragging the "Input" or the "Output". An "Action", a "Check" and a "Storage" are what binds to an operation.
The rule
A route belongs to a product through its operations: an "Action" and a "Check" stand where their operation is done. The editor puts a bound node over the middle of its operation, one cell higher.