Tell the human from the machine

While the machine runs, the worker may be busy at it or free. That decides how much human time a piece takes.

On the canvas

The step "Bore the hole" with the action "Boring": "Press by hand" and "Machine time" with 500 raw typed into it. Under the action is a card with its time. On the right the panels "Properties" and, under it, "Result" are open.

Steps

  1. Click "Machine time". "Properties" shows "Value" 500 and the list "Mechanization" set to "Manual labour". On the card the row H (human) is greater than the row M (machine): the worker is busy all the time the machine runs.
  2. In the list "Mechanization" choose "Automatic". The row H drops: the machine runs by itself.
  3. Now choose "Machine-manual". The row H grows, but not back to what it was: the worker is busy part of the time.

Check

The card of the action:

FHMP
At the start1003.60503.60500.00503.60
After step 2503.603.60500.00503.60
After step 3803.60303.60500.00503.60

If it did not work

The rule

H is the human time, M the machine time, F their sum, as if one went after the other. P is the time per piece: what the human and the machine do at the same time is not added up in it. Mechanization changes only the human's share — M and P stayed the same here.