Order the assembly operations

A board is first printed with paste, then the components are placed, then it is reflowed. The order of operations in a recipe is changed on the bus — put the placement before the reflow.

On the canvas

The Recipe (the technological process) "Assembly" with three operations in the wrong order: "Paste printing", "Reflow", "Placement". The panels are closed; their buttons are at the top of the canvas.

Steps

  1. Right-click the recipe "Assembly" and choose "Children on a bus". The operations line up on a vertical line — the bus.
  2. Drag the operation "Placement" up, above the operation "Reflow", and release. The operations swap places.
  3. Right-click "Assembly" again and choose "Children on a bus". The bus is gone, the new order stays.

Check

The operations stand like this: "Paste printing", "Placement", "Reflow".

If it did not work

The rule

On the bus the order of an operation is its height: the higher, the earlier. The time of the recipe does not depend on the order, but the route and the card follow it.