Time structure
Time structure. Display in the Result block for all canvas objects
F : Full Time of the operation. Sum of personnel working time and machine time.
It is prohibited to use an estimate based on analysis of this figure for purposes other than determining the overall workload of the operation.
H : Human Time โ personnel working time.
Optimally required time for personnel to be at the workstation to perform the operation
M : Machine Time โ machine operating time.
Optimally required time for equipment, machine, tool, or fixture operation with or without personnel involvement
P : Part Time (calendar) โ optimally required time to manufacture one unit of product. Followed by 2 figures โ the first is the labor intensity percentage determined by main transitions, and the second by auxiliary ones.
The time standard that is the sole and unconditional source of objective information about the labor intensity of product manufacturing within a Technological operation.
CT : Cycle Time and the expected deviation
Q : Quality Level (sigma level) โ the level of statistical stability of operation execution time, expressed as a sigma equivalent, ranging from 3 to 5.8
Q does not evaluate product quality or operation correctness.
Q describes how predictable in time the operation is when repeated.
D : DPMO โ expected number of time deviations beyond the acceptable corridor per 1,000,000 operation executions.
This is not a product defect, but a time defect
(rhythm, takt, or plan violation).
S : Stability (process stability 0โฆ1) โ normalized stability calculated from factors: nm = mechanization level/5, np = production type/3, S = clamp(0..1, 0.6nm + 0.4np)
Interpretation:
1.0 โ maximally stable (within the model)
0.0 โ maximally unstable
L : Expected Deviation
Normalized characteristic of the expected deviation of operation execution time from the nominal value during repeated execution.
In the model L is stored as a dimensionless value
(mathematical expectation of relative deviation).
L is displayed in time units and is used as the expected cycle deviation:
L โ tolerance
L โ worst case
L โ typical (expected) deviation
ST โ Setup Time
Full stop for reconfiguration and preparation for the next product release, driven by the technology and organization of the production process, as well as the time spent on maintenance of equipment required precisely and only for the specific operation/stage.
Reduces the available working time budget on first start or changeover from a different product type
PR โ Preparing Time
Time for one-time per-shift operation preparation, independent of the number of items
(setup, adjustment, tool preparation).
Reduces the available working time budget every shift
F1, H1, M1, P1 โ Adjusted values (per batch)
Part time including the distribution of preparatory costs.
The percentage shows the contribution of preparation and setup to the total time.