Control Plan
A Control Plan is a structured quality specification attached to an operation. It defines what to inspect, how to measure it, how often to sample, and what to do when a measurement falls outside limits. Every operation can carry multiple control plan items โ together they form the operation's quality gate.
Structure of a Control Plan Item
Each control plan item describes a single inspection checkpoint:
Basic Information
- Code โ short identifier (e.g. CP-001) used to reference the item in reports and shop-floor documentation
- Title โ localized description of what is being controlled
- Physical Sense โ the physical dimension being measured: Dimension, Angle, Mass, Force, Torque, Temperature, Pressure, Voltage, Current, Resistance, Viscosity, Hardness, Roughness, or other
- Unit โ measurement unit corresponding to the physical sense (mm, kg, Nยทm, ยฐC, etc.)
- Document โ reference to the applicable specification or standard
Value Type
Each item specifies how the acceptable value is expressed:
- Interval โ a nominal value with upper and lower bounds (e.g. 12.00 ยฑ 0.05 mm)
- Deviation โ a nominal with asymmetric tolerances (e.g. 12.00 +0.02 / โ0.01)
- Range โ an acceptable band without a named nominal (e.g. 5.0 โฆ 7.0)
- List โ a set of discrete acceptable values (e.g. "Red", "Blue", "Green")
- Boolean โ pass / fail check (e.g. "Surface defect present: Yes/No")
Sampling Strategy
Sampling defines how often the inspection is performed:
Sampling Frequency
- Every N Pieces โ inspect every Nth unit (e.g. every 10th piece)
- Per Shift โ inspect once per shift
- Continuous โ inspect every unit
- At Start โ inspect at the beginning of a run
- Custom โ user-defined frequency with description
Sample Size
Specified as either:
- Pieces โ absolute number (e.g. 5 pieces per check)
- Percent โ relative to batch (e.g. 2% of batch)
First-Piece Check
A boolean flag that, when enabled, mandates inspection of the very first piece after setup or changeover โ regardless of the normal sampling frequency.
Rejection Number
The maximum number of non-conforming units in a sample before the batch is rejected. Follows standard acceptance sampling logic.
Evaluation Method
Describes how the measurement is performed:
- Measuring Instrument โ caliper, micrometer, CMM, etc.
- Visual Inspection โ trained operator assessment
- Go/No-Go Gauge โ limit gauges for quick pass/fail
- Functional Test โ operate the part to verify function
- Checklist Audit โ structured checklist verification
- Barcode Verification โ scan and compare to expected value
- Statistical Analysis โ SPC chart evaluation
- Simulation Model โ digital twin comparison
Each method carries a localized instruction note โ free text where the engineer explains the exact tools, setup, or procedure.
Reaction Plan
Defines what happens when a non-conformance is detected:
- Stop Production โ halt the line immediately (boolean flag)
- Notify โ send notification to one or more roles: Operator, Quality Inspector, Engineer, Production Manager, Shift Leader, Process Engineer, Maintenance
- Recheck Quantity โ how many additional units to inspect
- Rework โ whether rework is permitted for the defective unit
- Escalation โ which role to escalate to if the problem persists
- Note โ localized free-text instructions for the reaction procedure
Risk Assessment (FMEA)
Each control plan item includes a built-in FMEA (Failure Mode and Effects Analysis) block:
Failure Description
- Failure Mode โ what can go wrong (e.g. "Diameter out of tolerance")
- Cause โ why it happens (e.g. "Tool wear after 500 cycles")
- Effect โ consequence if it reaches the customer (e.g. "Assembly interference")
Risk Scores
- Severity (S) โ impact of the failure, 1โ10
- Occurrence (O) โ likelihood of the failure, 1โ10
- Detection (D) โ chance of detecting before shipment, 1โ10
- RPN โ Risk Priority Number = S ร O ร D (legacy metric, kept for trending)
Action Priority
The primary decision metric โ replaces RPN for decision-making per AIAG/VDA 2019:
- H โ High priority, immediate action required
- M โ Medium priority, action planned
- L โ Low priority, monitoring
The method can be set to AIAG_VDA_2019 or CUSTOM, with an optional rationale field for audit trail.
Traceability
Each control plan item tracks:
- Responsible Role โ who is accountable for this inspection
- Audit Flags โ markers for internal/external audit relevance
Revision History
Every change to a control plan item is logged with a timestamp and user identifier. This creates an audit trail showing when parameters were added, modified, or disabled.
Enabled/Disabled State
Control plan items can be toggled on and off. The state change history is preserved โ showing when an item was activated or deactivated and by whom.
Where Control Plans Live
Control plans are attached to Operations. Each operation has a `.core.cp` array containing all its control plan items. When the operation is saved, the control plan data is serialized and stored alongside the process data.
To add a control plan item, select an Operation and open the control plan section in the properties panel.