Walk along a route
A finished route can be walked: from a node to its operation, from one node to the whole chain, from an arrow to its ends.
On the canvas
The route Input โ Action โ Check โ Output. The "Action" and the "Check" are bound to the operation "Lathe work" by dashed lines. The panels are closed, their buttons are above the canvas.
Steps
- Right-click the "Action" and choose "Go to" โ "Linked" โ "Lathe work". The operation is selected and the canvas has moved to it.
- Right-click any node of the route and choose "Select" โ "The whole flow chain". All four nodes are selected.
- Click the arrow between the "Check" and the "Output". Both of its ends are framed, and a hint "Check โ Output" appears by the pointer.
Check
The "Linked" list of the "Action" has three rows: the neighbouring nodes "Input" and "Check" and the operation "Lathe work".
If it did not work
- The menu has no "Go to" row โ several elements are selected. Right-click an empty spot, the selection clears, and try again.
- No hint by the arrow โ rest the pointer on the arrow without moving it.
The rule
A node is tied to its neighbours by arrows and to its operation by the binding. The chain is every node that can be reached along the arrows, either way.