๐Ÿ“– This is a static documentation page. Open the interactive version with live canvas demos โ†’

Spread setup over the batch

A setup is done once per batch, so one piece carries only a share of it. Set the batch size and watch the norm per piece change.

On the canvas

The operation "Lathe work"; its step "Set up the machine" already has the type "Setup". Under the operation is the card of its result. On the right the "Properties" panel is open; the card shows the same rows as the "Result" panel.

Steps

  1. Click the operation "Lathe work". On the card: P โ€” 11.38, ST โ€” 6.16, P1 โ€” 17.54. The batch is one piece, so it carries the whole setup.
  2. In "Properties", in the section "Parameters", type 10 into the field "Min Batch Size" and press Enter. The row P1 becomes 11.99.
  3. Type 100 into the same field and press Enter. The row P1 becomes 11.44.

Check

The rows P and ST did not change. The row P1 holds 11.44, and beside it 0.5% โ€” by that much the norm per piece is above P.

If it did not work

The rule

P1 is the norm per piece: P plus setup and preparation spread over the batch. The rows ST, PR and F1โ€“P1 are in the result of an operation, a recipe and a product. A step and an action do not have them.