Resources
Resources are detailed specifications attached to elements that describe the materials, equipment, personnel, and infrastructure required to perform work. While environment elements model where and who, resources model the specifics โ serial numbers, accounting codes, costs, depreciation, shifts, and grades.
Resource Categories
Components & Materials
- Component โ a specific part or assembly used in the product (e.g., "M8ร25 hex bolt, Grade 8.8")
- Material โ raw or consumable material (e.g., "ABS filament, 1.75mm")
- Component Analog โ an approved substitute for a component
Each component carries:
- Part Number (PN) and Code โ identification
- Unit โ measurement unit (pcs, kg, m, L, etc.)
- Quantity โ amount required per operation cycle
- Price and Currency โ unit cost
- Accounting Code โ for ERP integration (default: 121C)
- Extra Attributes โ extensible key-value pairs for domain-specific data
Equipment & Tools
- Equipment โ a machine, device, or major fixture
- Tool โ a cutting tool, forming die, or measuring device
- Instrument โ a calibrated measuring instrument
Equipment resources include:
- Serial Number (SN) โ unique device identifier
- Installation Date โ when the equipment was put into service
- Depreciation Start โ date from which depreciation is calculated
- Depreciation Rate โ annual rate (e.g., 0.1 = 10% per year)
- Service Intervals โ scheduled maintenance periods
- Accounting Code โ default: 1470E
Personnel
- Staff โ a person or headcount requirement
Staff resources specify:
- Role โ worker, technician, engineer, manager, office, logistics, warehouse, or other
- Grade โ skill level from F (entry) to A (expert)
- Quantity โ headcount required
- Salary and Currency โ labour cost
- Part-Time flag โ whether partial allocation is possible
- Accounting Code โ varies by role (1411 for workers, 1511 for engineers, 1421 for managers, etc.)
Profession & Shifts
- Profession โ defines the required trade or specialisation
- Shift โ defines work schedule structure
A Profession resource contains:
- Shifts array โ the shift patterns available for this role
- Week Schedule โ maps each day (Monday=0 through Sunday=6) to a shift ID
Infrastructure & Other
- Workplace, Area, Production, Warehouse, Factory, Office, Logistics, Sales, R&D โ organisational units (overlapping with environment types, but used here as resource specifications)
- Company, Holding โ higher-level organisational resources
- Document โ reference documents (drawings, procedures, standards)
- Budget โ cost allocation resource
Resource Panel
Each canvas element can display a resource panel โ a floating panel showing all resources linked to that element.
The resource panel shows:
- List of attached resources by category
- Active resource details (the selected resource in the list)
- Scroll position per category (remembered between panel opens)
Resources are displayed and edited through the properties panel when the element is selected.
Linking Resources to Elements
Resources are added to an element through the properties panel. Each resource becomes an entry in the element's resource list. Resources can be added to any level of the hierarchy โ Product, Operation, Step, or Action.
The placement determines the scope:
- Resources on a Product apply to the entire production
- Resources on an Operation apply to that specific processing step
- Resources on a Step or Action are highly specific, pinpointing exactly what is needed for that piece of work
Accounting Codes
Resources carry accounting codes for integration with ERP and financial systems:
- 121C โ components and materials
- 1470E โ equipment
- 1411 โ workers
- 1415 โ technicians
- 1511 โ engineers
- 1421 โ managers
- 1810 โ office staff
- 1611 โ logistics
- 1811 โ other staff
These codes are defaults and can be customised per resource.